Well, we had a pretty nice day for riding here in Chicagoland today and I just got back from riding the entire Paul Douglas Bike Trail and the connecting Crabtree Bike Trail.
I was about to write how there were no problems at all on either of the trails until I got to the very end (last 1/4 mile) of the Crabtree Trail (the northern end). There is one little section that is under construction and the sign says for 2 weeks. It’s really no big deal and it is passable too if you want to get out to the parking area off of Palatine Road.
Anway, as for the Paul Douglas Bike Trail, the entire trail is open and there are no problems. Even the one section that has flooded occasionally (on the west end of Paul Douglas) was clear and dry.
There were some puddles and wet places and my legs got a light spray of water as I rode by (I didn’t slow down much from average of about 13 mph so if you slowed down more you would stay completely dry).
I was glad to see that there was no flooding on the west side of Paul Douglas like there was in the past (see the Paul Douglas Trail flooding page) even though it is still pretty wet out there. Of course we are supposed to get some big storms tomorrow so we’ll see if it stays clear and dry. I am pretty optimistic.
My favorite part of this trail remains the loop around Paul Douglas (skipping the part along Algonquin Road) but the little strip that goes into the Crabtree preserve (about 1 mile) is very nice too. The Paul Douglas loop is about 7 miles (counting the part along Algonquin Road).
Well, it was great to get out there today and the Paul Douglas Trail is still a great place to ride. If anyone has any updates, please let me know or post a reply if you like.
Later, Rob.